Project Description

Case Study

Do You Have A Floor Project We Can Help With?

Get a free quote

Case Study: Fix standing water issue at a Pharmaceutical Manufacturer

ACC Flooring Ltd was asked by a long standing client to resolve an issue of standing water in a pharmaceutical manufacturing plant.

Due to some modifications which the client had carried out to the area, standing water was causing both a hygiene issue & a potential slip hazard.

The substrate was marked out prior to the diamond saw cutting of the concrete & the removal of all spoils. A new connection was made before the installation of a new Blucher UK stainless steel gulley pot. The underground pipework was then connected to the existing gulley.

The new drainage system was then back filled with ACC Bulk a resin rich heavy duty polyurethane repair mortar which is hand trowelled to a thickness of 10 – 60mm depending upon the nature of the application or repair.

Altro Screed epoxy quartz system @ 4mm was then installed to match the existing flooring with 2 coats of Altro Screed clear seal to complete the application.

The client was delighted with the result with all the work completed over a 3 day timeframe causing minimal amount of downtime.

REQUEST A PROPOSAL

Advice and site survey

We offer free technical advice on resin flooring. As well as quotations, product recommendations and free on site surveys.
REQUEST A PROPOSAL

Project Details

DATE

November 2020

LOCATION

Huddersfield, West Yorkshire

INSTALLATION TYPE

Heavy Duty Polyurethane Flooring

PROJECT TYPE

Industrial Flooring

FINISH TYPE

FeRFA Type 8

DOWNLOAD

Download this case study (PDF 600kb) and show to your work colleagues.

Project Gallery

new drainage installed to fix standing water issue
creating new drainage connecting to existing piping
completed drainage works
carrying out works to fix a standing water problem
before new drainage was installed

More Case Studies